Dubai · The Fitworks collection
+971 58 827 4544WhatsApp
Oriva / Materials & makers

Chosen with intention.

A starting point for your specification conversation. Explore materials and established product makers, then select against your project’s actual requirements.

A private courtyard plunge — design concept
Pool systems

AstralPool

Explore the maker’s current collections and technical information. We review the selected model, dimensions, finish and installation requirements as part of the project specification.

Visit the official collection
Pool equipment

Fluidra

Explore the maker’s current collections and technical information. We review the selected model, dimensions, finish and installation requirements as part of the project specification.

Visit the official collection

Brand names identify products for consideration. They do not imply an authorised dealership, endorsement or partnership. Availability, supply, installation and manufacturer warranty terms are confirmed for the selected products.

From inspiration
to specification.

Review samples in the setting where they will be used. Consider cleaning, maintenance, exposure and the details where materials meet. Final product information should be coordinated with the drawings before purchasing or fabrication.

Discuss your material brief
THE SPECIFICATION NOTEBOOK

Choose with the whole life of the material in mind.

Compare the use, installation and care of each selected product. Samples establish a direction; the final schedule should identify the exact references, locations, quantities and responsible suppliers.

Pool material concept showing textured coping, blue-green waterline tiles and a separate planted terrace.
Original design concept

Pool tile and mosaics

Where it contributes
A waterline and interior finish selected for the intended pool system.
Before approval
Review the product, substrate, waterproofing, adhesive, grout, joints and installation specification together.
After installation
Follow the installer and manufacturer's cleaning and water-care guidance.

Coping and surrounding paving

Where it contributes
A safe and coherent relationship between the pool edge and terrace.
Before approval
Review grip, edges, temperature underfoot, levels and drainage with the appointed designer.
After installation
Keep the finish specification and maintenance instructions.

Pumps, filters and controls

Where it contributes
Supporting circulation and the specified treatment system.
Before approval
Compare the complete designed system, duty, controls, energy considerations and access; equipment should be selected by the appointed specialist.
After installation
Keep model details, maintenance schedules and qualified service contacts.

Further product and planning research

Use current information from the relevant manufacturer or authority for the actual scope. These references do not imply a supplier partnership or endorsement.

YOUR QUESTIONS, ANSWERED

A clearer next step.

Practical answers for your pool design & construction brief.

Browse all common questions

THE NEXT CHAPTER

Let’s make room
for your plans.

Tell us what you have in mind. Start a conversation or send a written project brief.

Send a project enquiry