An original pool design & construction concept exploring how material, proportion and practical use can work together.
Original design concept · Oriva Pools
The brief
Pool projects combining design quality with visible technical delivery. This study explores a setting where daily use and a clear visual language guide the design together.
The design thinking
Oriva brings architectural thinking to pool projects, supported by a clearly defined technical scope. The water, the surrounding space and the equipment behind it all belong in one coordinated plan. The concept brings that approach into a spatial idea, using a restrained material palette and clear relationships between the main elements.
From concept to your property
A visual direction is the beginning of a conversation. Translating it into a project requires measured information, a site review, specialist coordination and an agreed specification.
A pool’s visible geometry is only part of the scope. Structure, ground conditions, plant and surrounding levels must be coordinated.
Original design concept
Concept: residential pool project
The detail study narrows the wider brief to a private courtyard plunge. Make the water part of the architecture while allowing appropriate space for access, equipment and long-term care.
Design decisions
Describe intended users and swimming patterns before fixing the shape.
Have the appointed specialists review engineering and safety requirements.
Reserve plant and maintenance access in the first coordinated plan.
PROPOSED PROJECT TIMELINE
From the first brief to handover.
A proposed sequence for this design study. External review periods, site conditions and supplier lead times are confirmed for each commissioned project. Some stages may overlap.
Stage 1
Discovery & measured brief
Make the water part of the architecture while allowing appropriate space for access, equipment and long-term care.
Review point · A scope and responsibility record
Stage 2
Design & coordinated specification
Describe intended users and swimming patterns before fixing the shape.
Review point · A reviewed drawing and specification package
Stage 3
Selections & procurement planning
Have the appointed specialists review engineering and safety requirements.
Review point · A selection register and supply responsibilities
Stage 4
Proposed delivery sequence
Reserve plant and maintenance access in the first coordinated plan.
Review point · Staged inspections and change records
Stage 5
Review & handover planning
Review the agreed scope and record outstanding items before completion is accepted.
Review point · A snagging list, care information and agreed close-out
SPECIFICATION & QUALITY
Details that can be reviewed.
Concept palette
Turquoise water and mineral-toned finishes
Pale coping concept
Restrained landscape edges
Proposed quality records
Project-specific engineering and services information
Specified testing and commissioning records
Operating, care and warranty responsibilities
The concept aims for a coordinated and usable space. Performance requirements, cost and completion milestones are agreed for each commissioned project.