Dubai · The Fitworks collection
+971 58 827 4544WhatsApp
DESIGN STUDY / 01

The long view

An original pool design & construction concept exploring how material, proportion and practical use can work together.

The long view — original design concept
Original design concept · Oriva Pools

The brief

Pool projects combining design quality with visible technical delivery. This study explores a setting where daily use and a clear visual language guide the design together.

The design thinking

Oriva brings architectural thinking to pool projects, supported by a clearly defined technical scope. The water, the surrounding space and the equipment behind it all belong in one coordinated plan. The concept brings that approach into a spatial idea, using a restrained material palette and clear relationships between the main elements.

From concept to your property

A visual direction is the beginning of a conversation. Translating it into a project requires measured information, a site review, specialist coordination and an agreed specification.

  • Size, depth, shape and access
  • Ground and structural conditions
  • Waterproofing and finish specification
  • Plant, controls and commissioning
Develop a brief like this
THE STUDY IN DETAIL

The challenge behind the idea.

A pool’s visible geometry is only part of the scope. Structure, ground conditions, plant and surrounding levels must be coordinated.

Original design concept

Concept: residential pool project

Make the water part of the architecture while allowing appropriate space for access, equipment and long-term care.

Design decisions

  • Describe intended users and swimming patterns before fixing the shape.
  • Have the appointed specialists review engineering and safety requirements.
  • Reserve plant and maintenance access in the first coordinated plan.
PROPOSED PROJECT TIMELINE

From the first brief to handover.

A proposed sequence for this design study. External review periods, site conditions and supplier lead times are confirmed for each commissioned project. Some stages may overlap.

  1. Week 1

    Discovery & measured brief

    Make the water part of the architecture while allowing appropriate space for access, equipment and long-term care.

    Review point · A scope and responsibility record
  2. Weeks 2–4

    Design & coordinated specification

    Describe intended users and swimming patterns before fixing the shape.

    Review point · A reviewed drawing and specification package
  3. Weeks 4–7

    Selections & procurement planning

    Have the appointed specialists review engineering and safety requirements.

    Review point · A selection register and supply responsibilities
  4. Weeks 8–13

    Proposed delivery sequence

    Reserve plant and maintenance access in the first coordinated plan.

    Review point · Staged inspections and change records
  5. Weeks 14–15

    Review & handover planning

    Review the agreed scope and record outstanding items before completion is accepted.

    Review point · A snagging list, care information and agreed close-out
SPECIFICATION & QUALITY

Details that can be reviewed.

Concept palette

  • Turquoise water and mineral-toned finishes
  • Pale coping concept
  • Restrained landscape edges

Proposed quality records

  • Project-specific engineering and services information
  • Specified testing and commissioning records
  • Operating, care and warranty responsibilities

The concept aims for a coordinated and usable space. Performance requirements, cost and completion milestones are agreed for each commissioned project.

Our project standards
YOUR QUESTIONS, ANSWERED

A clearer next step.

Practical answers for your pool design & construction brief.

Browse all common questions

THE NEXT CHAPTER

Let’s make room
for your plans.

Tell us what you have in mind. Start a conversation or send a written project brief.

Send a project enquiry